Is Born Series

Is Born Series A Chopper Is Born: Rotorway Exec 162F

TV Show

A Chopper Is Born: Rotorway Exec 162F Plot

Follow the fortunes of Mark Evans as he begins to build a fully functioning helicopter from a home kit and develops his flying skills by attaining a helicopter rating in Arizona.

Is Born Series A Chopper Is Born: Rotorway Exec 162F aired on January 1st, 2002.

A Chopper Is Born: Rotorway Exec 162F Episodes

1. Episode 1

January 1st, 200230 min

Mark Evans begins building his home kit chopper before attempting his helicopter rating in Arizona.

2. Episode 2

January 8th, 200230 min

Mark Evans begins building the helicopter airframe and discovers the principles of helicopter flight.

3. Episode 3

January 15th, 200230 min

The airframe is complete and Mark turns his attention to the tail boom before beginning his helicopter flight training.

4. Episode 4

January 22nd, 200230 min

Mark begins the manufacture of the main rotor shaft before getting to grips with training on the controls and throttle.

5. Episode 5

January 29th, 200230 min

Mark installs the engine in his home kit helicopter and learns how to counter 'dead man's curve' - a potentially fatal beginner's mistake.

6. Episode 6

February 5th, 200230 min

Mark's helicopter is ready for the tail rotor drive and the clutch, and he learns how to deal with engine failure and autorotation.

7. Episode 7

February 12th, 200230 min

The exhaust and cooling systems are added to Mark Evan's helicopter, and he learns how to take off from hover position and from the ground.

8. Episode 8

February 19th, 200230 min

Mark fits the exhaust, fuel system, fuel pumps and pressure regulator to his helicopter, and learns flying level and straight, to slip and to skid.

9. Episode 9

February 26th, 200230 min

Mark turns his attention to the avionics and instrument panel, and learns about the most important instruments he needs to fly a helicopter.

10. Episode 10

March 5th, 200230 min

Mark learns how to climb and descend before installing the lights, navigation system and computer into his home-kit helicopter.

11. Episode 11

March 12th, 200230 min

Mark turns his attention to the body panel and back seats, before learning about landing and set downs.

12. Episode 12

March 19th, 200230 min

The main rotor blades are fitted to Mark Evans's home-made helicopter. And in his helicopter-flying lesson he learns all about taxiing.

13. Episode 13

March 26th, 200230 min

Mark Evans takes to the skies in his chopper to practise the quick stop. Back on the ground he installs the rigging into his home-made kit helicopter.

14. Episode 14

April 2nd, 200230 min

Mark paints the bodywork of his helicopter and installs the upholstery, before taking to the sky in another chopper to complete a circuit.

15. Episode 15

April 9th, 200230 min

We follow Mark as he reveals the finished home-kit helicopter and takes it into the skies for its first glorious flight. Last in series.