Moviefone App Coming Soon. Sign Up Now to Get Notified!

Season 24 Episodes

1. Sculpture Studio Extension - Floor

February 6th, 201030 min

The Hometime crew uses pavers and retaining walls to capture space under a second-story deck.

2. Sculpture Studio Extension - Walls

February 13th, 201030 min

The Hometime crew frames and insulates curtain walls to enclose the space under a second-story deck.

3. Sculpture Studio Extension - Wrap Up

February 20th, 201030 min

The Hometime crew finishes the space under a second-story deck to expand a workshop used to create metal sculpture.

4. Stone Cottage – Cul-De-Sac Prep

February 27th, 201030 min

The Hometime crew works with surveyors, graders and architects to prepare a building site. Episode one of a thirty part series focusing on this well-designed, state-of-the-art home.

5. Stone Cottage – Concrete & Foam

March 6th, 201030 min

The Hometime crew works with a contractor to excavate for the new house and use poured-in-place insulating concrete forms for the basement walls.

6. Stone Cottage – Instant House

March 13th, 201030 min

The Hometime crew helps out as the floors and walls of the house are pre-built in a nearby factory and then quickly assembled at the job site on top of the foundation.

7. Stone Cottage – Roofscape

March 20th, 201030 min

The Hometime crew watches as the intricate roof framing components for the house are pre-built off-site, assembled on the ground, and finally hoisted into place.

8. Stone Cottage – Windows

March 27th, 201030 min

The Hometime crew supervises the design, construction and installation of the windows for the home, and explains the natural slate roofing system.

9. Stone Cottage – Concrete Floors

April 3rd, 201030 min

The Hometime crew prepares for and supervises the installation of the basement, garage and porch floors.

10. Stone Cottage – Inner Workings

April 10th, 201030 min

The Hometime crew manages the installation of the ductwork, recessed lighting, and central vacuum while also helping out with the driveway, stonework and siding.

11. Stone Cottage – Insulation

April 17th, 201030 min

The Hometime crew installs cables for lighting control, audio, video and security and helps out with several types of insulation.

12. Stone Cottage – Geothermal

April 24th, 201030 min

The Hometime crew helps out installing the radiant floor heating system and the geothermal heating and cooling equipment.

13. His and Her Garage

September 11th, 201030 min

The Hometime crew wraps up a project with a second floor yoga studio for “her” and a garage-level workshop for "him."

14. Stone Cottage -- Interior Walls

September 18th, 201030 min

After some last-minute preparation crews install four different types of wall board for the interior walls and ceilings.

15. Stone Cottage -- Vaulted Ceilings

September 25th, 201030 min

The project house gets sheathing for the floors, extra-tough primer on the walls, and a stained-cedar vaulted ceiling in three high-profile rooms.

16. Stone Cottage -- Millwork

October 2nd, 201030 min

Wooden beams are built outside for the porches. Inside, hardwood trim wainscoting is installed.

17. Stone Cottage -- Exterior Doors

October 9th, 201030 min

The Hometime crews scopes out how the custom matching garage and entry doors are made, and helps out leveling the floors for tiling.

18. Stone Cottage -- Tile

October 16th, 201030 min

The Hometime crew helps out as craftsmen install ceramic and natural stone tile in the bathrooms, natural stone on the fireplace, and natural stone for the retaining walls.

19. Stone Cottage -- Driveway

October 23rd, 201030 min

The Hometime crew installs the paver driveway, as well as the master bathroom cabinets.

20. Stone Cottage -- Interior Doors

October 30th, 201030 min

The Hometime crew works on the interior doors, kitchen cabinets, wainscoting, and exterior columns.

21. Stone Cottage -- Laundry Room

November 6th, 201030 min

The Hometime crew installs custom cabinets for the laundry room and starts the home’s wood flooring.

22. Stone Cottage -- Office

November 13th, 201030 min

The home office begins to take shape, as the custom staircase work begins.

23. Stone Cottage -- Countertops

November 20th, 201030 min

The stone countertops are fabricated and installed.

24. Stone Cottage -- Fixtures and Appliances

November 27th, 201030 min

The Hometime crew installs cabinets, countertops and landscaping.

25. Stone Cottage -- Retractable Screens

January 22nd, 201130 min

The covered porch gets motorized screens, the garage floor gets an epoxy coating, and the last few cabinets are installed.

26. Stone Cottage -- Sod and Stone

January 29th, 201130 min

The custom handrail is built, granite countertops are installed, the drip irrigation is wrapped up, and the yard gets sod.

All Seasons

Season 27

Season 27

Feb 2, 2013
Season 26

Season 26

Feb 4, 2012
Season 25

Season 25

Feb 5, 2011
Season 24

Season 24

Feb 6, 2010
Season 23

Season 23

Feb 7, 2009