Moviefone App Coming Soon. Sign Up Now to Get Notified!
Home Again with Bob Vila

Home Again with Bob Vila Season 8: Episode Guide & Ratings

Season 8 Episodes

1. Craftsman Bungalow: Project Introduction

September 1st, 1997

A vintage Sears kit house is restored, but historic and sentimental elements are preserved.

2. Craftsman Bungalow: Wiring, Plumbing and Plastering

September 8th, 1997

A closet is transformed into a bathroom, while new and old building materials are blended in the living and dining rooms.

3. Craftsman Bungalow: Reconditioning the Windows

September 15th, 1997

Bob Vila oversees the reconditioning of an original window in the Sears kit house. Also: a tour of Frank Lloyd Wright's Hollyhock House.

4. Craftsman Bungalow: Interior Trim and Porch Framing

September 22nd, 1997

Interior trim details are custom-milled as per the architect's specifications, and original bathroom fixtures are re-porcelainized. Also: framing continues on the back porch.

5. Craftsman Bungalow: Repairing the Front Facade

September 29th, 1997

Vintage cabinetry is discovered in a salvage yard and installed in the kitchen; yellow paint is stripped off; and the facade is given a facelift.

6. Craftsman Bungalow: Swimming Pool and Porch

October 6th, 1997

The pool crew finishes the rebar and sprays gunnite, while French doors are installed in the master bedroom and the porch roof is repaired.

7. Craftsman Bungalow: Working On the Pool

October 13th, 1997

Green Indian slate is installed on the surround and porch steps. Also: the backyard entry gate is finished.

8. Craftsman Bungalow: Exterior Paint Preparation

October 20th, 1997

At the Sears kit house, the exterior is stripped for priming and painting. Also: a tour of the CBS studio center.

9. Craftsman Bungalow: Floor Tile and Cabinet Installation

October 27th, 1997

The bathroom is tiled, new kitchen cabinets are custom-made to match the vintage ones, and decking is installed on the back porch.

10. Craftsman Bungalow: Installing Custom Light Grids

November 3rd, 1997

The electrician installs back lighting in the living room, and six stained-glass panels are cut and assembled. Meanwhile, contractors insulate the roof.

11. Craftsman Bungalow: Installing Cabinets

November 10th, 1997

A cabinetmaker frames boxes for living-room built-ins to match existing ones in the kitchen, and the pool crew finishes the plaster.

12. Craftsman Bungalow: Hardwood Floor Repair and Refinishing

November 17th, 1997

Damaged hardwood flooring is repaired and an alder kitchen countertop is installed. Also: a tour of the Japanese Garden at Huntington Library and tips on building a Zen garden.

13. Craftsman Bungalow: House Tour

November 24th, 1997

Bob Vila leads a final tour of the landscaped front yard and the porch addition, which features a barbecue. Also toured are the Zen garden and swimming pool.

14. Dream Garage: Project Introduction

December 1st, 1997

Plans for a post-and-beam garage and boat storage project are discussed with an architect. Also: touring a marina with America's Cup champ Bill Koch.

15. Dream Garage: Working On the Foundation

December 8th, 1997

Foundation work is begun, while Bob Vila tours an antique car museum in a Shaker-style round barn in Sandwich, MA.

16. Dream Garage: More Foundation Work

December 15th, 1997

As the foundation is prepared, Bob Vila explains termite-proofing and oversees the installation of a hydronic heating system.

17. Dream Garage: Framing the Garage

December 22nd, 1997

A look at framing, and the special techniques and tools that are used for it. Also: a tour of a lumber company examines pre-cut materials for the post-and-beam plan.

18. Dream Garage: Framing and Decking

December 29th, 1997

New decking is installed in the loft, while Bob Vila and the crew put up the ridge beam and rafters. Also: a joinery specialist demonstrates house framing.

19. Dream Garage: Insulating the Garage

January 5th, 1998

Insulation panels are installed and Bob Vila visits a factory where all-in-one wall product is made.

20. Dream Garage: Exterior Trim and Siding

January 12th, 1998

Windows, exterior trim and siding are installed. Also: a tour of the American Plywood Association lab, where quality testing is observed.

21. Dream Garage: Skylights and Metal Roofing

January 19th, 1998

Metal roofing is installed and drywall is put up around the skylights.

22. Dream Garage: Installing Protective Features

January 26th, 1998

Bob Vila takes a look at such safety features as motion detectors, a fire-suppression unit and a lightning rod.

23. Dream Garage: Installing a Staircase and Paneling

February 2nd, 1998

A horticulturalist shares general landscaping tips and offers special advice on the use of native plants and trees. Also: building a staircase to the loft.

24. Dream Garage: Heating and Lighting

February 9th, 1998

A garage-door opener is installed, the heated-floor system is activated, and interior paneling is stained. Also: track lighting goes in.

25. Dream Garage: Setting up the Workshop and Garage

February 16th, 1998

The interior of the barn is stained and a workshop is assembled. Also: race-car driver Lyn St. James helps Bob Vila set up the automotive garage with new tools.

26. Dream Garage: Barn Tour

February 23rd, 1998

Workbenches are completed and metal shelves are installed in the loft, before Bob Vila leads a tour of the finished barn.

All Seasons

Season 15

Season 15

Sep 13, 2004
Season 14

Season 14

Sep 8, 2003
Season 11

Season 11

Sep 4, 2000
Season 10

Season 10

Sep 6, 1999
Season 9

Season 9

Sep 7, 1998
Season 8

Season 8

Sep 1, 1997
Season 7

Season 7

Sep 2, 1996
Season 6

Season 6

Sep 4, 1995
Season 5

Season 5

Sep 5, 1994
Season 3

Season 3

Sep 7, 1992
Season 2

Season 2

Sep 2, 1991
Season 1

Season 1

Sep 3, 1990