Moviefone App Coming Soon. Sign Up Now to Get Notified!
Home Again with Bob Vila

Home Again with Bob Vila Season 2

Season 2 Episodes

1. Split-level Ranch: Selecting the House

September 2nd, 1991

A new project is introduced: the renovation of a 17-year-old ranch-style house in Plymouth, Mass. Included: a look at other homes in Plymouth.

2. Split-level Ranch: Demolition and Remodeling

September 9th, 1991

The deck and front entryway are demolished. Also: a look at an architect's computer-generated plans for the house.

3. Split-level Ranch: Framing and Demolition

September 16th, 1991

Construction begins on the front entryway; the old bathroom fixtures are removed.

4. Split-level Ranch: Septic System, Bathroom Fixtures and Windows

September 23rd, 1991

Work begins on the new bathroom; a window and roof trim are added to the entryway. Also: landscaping plans.

5. Split-level Ranch: Paint Prep, Attic Louver and French Doors

September 30th, 1991

A broken storm window is replaced; tile work is started in the bathroom; a bathroom vanity is installed. Also: a tour of a tile factory in Florida.

6. Split-level Ranch: Bay Window and Cabinet Doors

October 7th, 1991

Installed: a bay window in the dining room; cabinet doors in the kitchen. Also: a tour of a country-style kitchen in Nantucket, Massachusetts.

7. Split-level Ranch: Counters, Deck and Vinyl Floor

December 22nd, 2024

Installed a laminated kitchen countertop, and a vinyl floor. Also, the exterior is painted and a backyard deck is started.

8. Split-level Ranch: Fireplace and Deck

October 21st, 1991

Colonial-style molding and a mantelpiece are installed in the living room; the backyard deck is completed. Also: a visit to the home of John Adams (1735-1826) in Quincy, Massachusetts.

9. Split-level Ranch: Masonry and Floor

October 28th, 1991

A masonry barbecue is repaired; the basement remodeling begins.

10. Split-level Ranch: Installing Wallpaper, Door and Paneling

November 4th, 1991

A decorator offers suggestions on choosing wallpaper; a paperhanger demonstrates his craft in the living room. Also: a floor is installed in the family room; a front door is crafted.

11. Split-level Ranch: Light Fixture Wiring and Trellis

November 11th, 1991

Wiring is installed for a Colonial-style light fixture and a the refrigerator's icemaker is hooked up. Also: a trellis is constructed in the front yard.

12. Split-level Ranch: Plate Rack Construction

November 18th, 1991

Bob constructs a plate rack for the dining room and shops for carpet for the living room. Outside, shrubs are transplanted, perennials are planted and the lawn is sodded.

13. Split-level Ranch: House Tour

November 25th, 1991

The finished house is toured, including the basement rec room, and the designer discusses the Colonial decor. Also: a look at the outside elements such as landscaping, gutters and a trellis.

14. Cracker Cottage: Selecting and Touring the House

December 2nd, 1991

Bob goes hunting for a house to remodel in Naples, Florida. He tours the 'Cracker' cottage he plans to renovate, then looks at similar, recently revamped cottage for inspiration.

15. Cracker Cottage: Outdoor Work and Planning

December 9th, 1991

A landscaper transplants a frangipani tree. Also: termite damage is checked.

16. Cracker Cottage: Demolition and Roof Brackets

December 16th, 1991

The architect presents her plans; the contractor explains the demolition process.

17. Cracker Cottage: Installing a Door and Removing Paint

December 23rd, 1991

Included: a visit to a salvage yard in search of doors and lavatories. Demonstrated: how to wash peeling paint from exterior siding.

18. Cracker Cottage: Paint Prep, Attic Louver and French Doors

December 30th, 1991

Demonstrated: smoothing out exterior siding using spackle; replacing an attic louver; and installing French doors in the entryway.

19. Cracker Cottage: Swimming Pool and Drywall Ceiling

January 27th, 1992

Included: the pool is tiled; drywall is installed in the living room; the carport is made into a garden area. Also: a visit to the development project in New York.

20. Cracker Cottage: Cabinets, Ceiling Fan and Porch Screen

February 3rd, 1992

Installed: kitchen cabinets; screening and a ceiling fan on the porch. Also: an update on the New York tenement project.

21. Cracker Cottage: Installing Windows and Shower

February 6th, 1992

Included: replacing porch windows and constructing a tongue-and-groove deck. Also: a shower-drain installation begins.

All Seasons

Season 15

Season 15

Sep 13, 2004
Season 14

Season 14

Sep 8, 2003
Season 11

Season 11

Sep 4, 2000
Season 10

Season 10

Sep 6, 1999
Season 9

Season 9

Sep 7, 1998
Season 8

Season 8

Sep 1, 1997
Season 7

Season 7

Sep 2, 1996
Season 6

Season 6

Sep 4, 1995
Season 5

Season 5

Sep 5, 1994
Season 3

Season 3

Sep 7, 1992
Season 2

Season 2

Sep 2, 1991
Season 1

Season 1

Sep 3, 1990